Shimano BB-R9100 Руководство дилера - Страница 18

Просмотреть онлайн или скачать pdf Руководство дилера для Аксессуары для велосипедов Shimano BB-R9100. Shimano BB-R9100 21 страница. Front chainwheel
Также для Shimano BB-R9100: Руководство дилера (21 страниц)

Shimano BB-R9100 Руководство дилера
INSTALLATION
Installation of the crank
(C)
(z)
(A)
4
(B)
Push in the stopper plate and check that
the plate pin is securely in place, and
then tighten the screws of the left crank
arm.
Tighten both screws equally to the
specified tightening torque (12 - 14 N·m).
(z)
The illustration is of the left crank
arm (cross-section)
18
(A)
Plate pin
(B)
Stopper plate
(C)
Left crank arm
Tightening torque
12 - 14 N·m
NOTICE
The two screws should be tightened
alternately in stages rather than each screw
being fully tightened at once.
Set the stopper plate in the correct
direction as shown in illustration.