Shimano BB-R9100 Manuale del rivenditore - Pagina 18
Sfoglia online o scarica il pdf Manuale del rivenditore per Accessori per biciclette Shimano BB-R9100. Shimano BB-R9100 21. Front chainwheel
Anche per Shimano BB-R9100: Manuale del rivenditore (21 pagine)
INSTALLATION
Installation of the crank
(C)
(z)
(A)
4
(B)
Push in the stopper plate and check that
the plate pin is securely in place, and
then tighten the screws of the left crank
arm.
Tighten both screws equally to the
specified tightening torque (12 - 14 N·m).
(z)
The illustration is of the left crank
arm (cross-section)
18
(A)
Plate pin
(B)
Stopper plate
(C)
Left crank arm
Tightening torque
12 - 14 N·m
NOTICE
•
The two screws should be tightened
alternately in stages rather than each screw
being fully tightened at once.
•
Set the stopper plate in the correct
direction as shown in illustration.