BlueSky Mast AL3 Series Hoja de referencia rápida - Página 3

Navegue en línea o descargue pdf Hoja de referencia rápida para Sistemas de elevación BlueSky Mast AL3 Series. BlueSky Mast AL3 Series 6 páginas.
También para BlueSky Mast AL3 Series: Hoja de referencia rápida (6 páginas)

AL3 Lift Series - Deployment Quick Reference Sheet
41
At 1/2 the total mast height -
Lock the cam lock on the Blue
Secondary Guy Ring.
46
When the guy ropes go taut - hold the guy rope in front of the handle and
slide it back approx. 4 feet. Doing this to all 4 primary guy ropes will give
you enough slack to add another center mast pole.
51
Adjust the guy ropes by holding
the rope in front of the handle
and sliding it back and forth.
56
Stake them into the ground,
adjust and lock all 4 secondary
guy ropes.
Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2013 Allendale LLC All Rights Reserved
42
Attach the blue clip from the
secondary guy rope to the
round hole on the guy ring.
52
Adjust the 4 primary guy ropes
and make sure the mast is
straight and perpendicular.
57
Drive 2 stakes into the 2 holes
on the lift base plate.
43
Walk away from the mast and
unwind all the guy rope.
DO NOT stake it at this time.
48
Repeat this process until you
are left with only the Base Pole.
53
Lock the primary guy ropes by
pulling a small amount of slack
in. Continued next step -
Read Manual Before Use
Refer to detailed instructions in the
AL3 Lift Series Manual at all times
44
Repeat this process until all
secondary guy ropes are de-
ployed. DO NOT stake them.
49
Lower the lift base plate and
insert the Base Pole. Raise until
it nest into the center mast pole.
54
Then grab the guy rope and
wrap it up and over the front
rope lock.
45
Raise the mast until the primary
guy ropes go taut. Incremental
guying may be required.
50
Release the cam lock and lower
the mast to the ground. Lock
the cam lock.
55
Position the secondary guy
ropes between the primary guy
ropes and extend them out.