coldline ICE550M-HA Manuel de l'utilisateur - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel de l'utilisateur pour {nom_de_la_catégorie} coldline ICE550M-HA. coldline ICE550M-HA 13 pages.
2. Schematic Diagram of Installation
3. Installation Steps
1. Check if the ice machine is in good
condition and the accessories are
complete; check the machine model and
the machine nameplate.
2. Clean the ice storage bin and the food
area inside with a sponge soaked in
warm water and soda. Then wash and
dry it with potable water.
3. Place the ice machine in the operation
area; ensure that the machine is placed
on a leveled floor. So as to ensure the
water flows evenly on the evaporator.
4. The compressor chamber is located at
the back. The compressor and condenser
are installed in it. For air cooled unit, it
requires good ventilation. Therefore, the
front and rear of the ice maker must have
ventilation space of more than 20-30 cm.
5. The bottom of the ice machine is
equipped with adjustable legs for level
adjustment and floor cleaning.
6. Connect the machine's inlet water filter
and water pipe referring to the schematic
diagram of installation; if the installation
site is already equipped with a drinking
water system, the water filter may not be
installed.
Note: the filter flow direction should
be correctly installed as per the direction
marker on the filter head cover or the filter
body.
USRESTAURANT® RESERVES THE RIGHT TO CHANGE SPECIFICATIONS WITHOUT NOTICE
Note: This machine is equipped with
an inlet water filter. The filter will have
impurities from the water accumulated as
the machine is running. Generally, it
needs to be replaced every month to every
3 months.
7. Connect the machine to the water supply
using the 3/4" inlet pipe supplied with the
machine. It is recommended to install a
water valve (not supplied with this
machine) on the water supply line.
8. Connect the drain pipe to the drain
connection. In order to meet a good
draining, it is recommended that the drain
pipe should have a difference of level
more than 3cm per meter; and confirm
that the drain pipe is not blocked. It is
recommended that the drain pipe be
connected to an open drainage port.
9. Any joint in the drain pipe must not be
higher than the machine drainage port;
any joint in the drain pipe cannot be
higher than the previous joint.
10. Confirm the power requirements stated in
the machine nameplate; ensure that the
power supply meets the requirements.
11. A circuit breaker or switch with leakage
protector and reliably grounding is
required.
12. Turn off the switch on the power line and
connect the machine to the power
4