Baumer GXAMS Manuel - Page 12

Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Baumer GXAMS. Baumer GXAMS 41 pages. Absolute encoder with powerlink interface
Également pour Baumer GXAMS : Manuel (19 pages), Manuel (26 pages), Manuel (24 pages), Manuel (19 pages)

Baumer GXAMS Manuel
E/A fields require defining partial process images in clock-synchronous operation, in the example it is TPA1.
Take care that the selected partial process image comprises the initial address. If not it will result in an error
signal when interpreting the project.

5.5. Parameterization

Upon double-click on the encoder icon at the bus bar, the window „Properties-DP-Slave" pops up, showing
the tabs "General", "Parameter Assignment" and "Clock synchronisation".
5.5.1.

General

System parameters under tab „General" may usually be adopted without modifications.
If required, encoder name, diagnosis address and node ID under button „Profibus..." may be altered. Further
here is the option to deactivate the encoder's response monitoring.
5.5.2.

Parameter assignment

Manual_ProfibusDPV2_BIDE_EN.docx
22.11.12
12/41
Baumer IVO GmbH & Co. KG
Villingen-Schwenningen, Germany