Baumer GXAMS Manual - Halaman 12
Jelajahi secara online atau unduh pdf Manual untuk Konverter Media Baumer GXAMS. Baumer GXAMS 41 halaman. Absolute encoder with powerlink interface
Juga untuk Baumer GXAMS: Manual (19 halaman), Manual (26 halaman), Manual (24 halaman), Manual (19 halaman)
E/A fields require defining partial process images in clock-synchronous operation, in the example it is TPA1.
Take care that the selected partial process image comprises the initial address. If not it will result in an error
signal when interpreting the project.
5.5. Parameterization
Upon double-click on the encoder icon at the bus bar, the window „Properties-DP-Slave" pops up, showing
the tabs "General", "Parameter Assignment" and "Clock synchronisation".
5.5.1.
General
System parameters under tab „General" may usually be adopted without modifications.
If required, encoder name, diagnosis address and node ID under button „Profibus..." may be altered. Further
here is the option to deactivate the encoder's response monitoring.
5.5.2.
Parameter assignment
Manual_ProfibusDPV2_BIDE_EN.docx
22.11.12
12/41
Baumer IVO GmbH & Co. KG
Villingen-Schwenningen, Germany