Baumer GXAMS Manuale - Pagina 12
Sfoglia online o scarica il pdf Manuale per Convertitore multimediale Baumer GXAMS. Baumer GXAMS 41. Absolute encoder with powerlink interface
Anche per Baumer GXAMS: Manuale (19 pagine), Manuale (26 pagine), Manuale (24 pagine), Manuale (19 pagine)
E/A fields require defining partial process images in clock-synchronous operation, in the example it is TPA1.
Take care that the selected partial process image comprises the initial address. If not it will result in an error
signal when interpreting the project.
5.5. Parameterization
Upon double-click on the encoder icon at the bus bar, the window „Properties-DP-Slave" pops up, showing
the tabs "General", "Parameter Assignment" and "Clock synchronisation".
5.5.1.
General
System parameters under tab „General" may usually be adopted without modifications.
If required, encoder name, diagnosis address and node ID under button „Profibus..." may be altered. Further
here is the option to deactivate the encoder's response monitoring.
5.5.2.
Parameter assignment
Manual_ProfibusDPV2_BIDE_EN.docx
22.11.12
12/41
Baumer IVO GmbH & Co. KG
Villingen-Schwenningen, Germany