Follett Horizon Elite HCD1410NJS Manuel d'instructions d'installation - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Follett Horizon Elite HCD1410NJS. Follett Horizon Elite HCD1410NJS 17 pages. Ice machine models with ride technology
installation instructions for drop-ins
Également pour Follett Horizon Elite HCD1410NJS : Manuel (8 pages), Manuel (8 pages)
Prepare the dispenser.
2.1
3.1
Dispenser preparation
4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
• Install gasket
➋
onto bulkhead fitting
• Attach bulkhead fitting with flat up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
cap
➑
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
➌
➍
and tighten bulkhead nut
➏
with supplied screws
➐
into bulkhead fitting and secure with coupling
remote condensing
Dispenser preparation
Hot Water
160 F (71 C)
12"
(304,8mm)
min.
➊
➎
➐
➓
DROP-IN • RIDE Technology
3
➒