Follett Horizon Elite HCD1410NJS 설치 지침 매뉴얼 - 페이지 6

{카테고리_이름} Follett Horizon Elite HCD1410NJS에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett Horizon Elite HCD1410NJS 17 페이지. Ice machine models with ride technology installation instructions for drop-ins
Follett Horizon Elite HCD1410NJS에 대해서도 마찬가지입니다: 매뉴얼 (8 페이지), 매뉴얼 (8 페이지)

Follett Horizon Elite HCD1410NJS 설치 지침 매뉴얼
Prepare the dispenser.
2.1
3.1

Dispenser preparation

4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
• Install gasket
onto bulkhead fitting
• Attach bulkhead fitting with flat up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
cap
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
and tighten bulkhead nut
with supplied screws
into bulkhead fitting and secure with coupling
remote condensing
Dispenser preparation
Hot Water
160 F (71 C)
12"
(304,8mm)
min.
DROP-IN  •  RIDE Technology
3