Follett Horizon Elite HCD1410NJS Manual de instruções de instalação - Página 6

Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite HCD1410NJS. Follett Horizon Elite HCD1410NJS 17 páginas. Ice machine models with ride technology installation instructions for drop-ins
Também para Follett Horizon Elite HCD1410NJS: Manual (8 páginas), Manual (8 páginas)

Follett Horizon Elite HCD1410NJS Manual de instruções de instalação
Prepare the dispenser.
2.1
3.1

Dispenser preparation

4"
(101,6mm)
• Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
• Drill 1 3/4" (44,5mm) hole through either side of dispenser
• Install gasket
onto bulkhead fitting
• Attach bulkhead fitting with flat up
• Position and secure nut locking plate
• Verify installation of O-ring on stainless steel ice transport tube coupling
• Insert stainless steel ice transport tube coupling
cap
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
• Attach ice transport tube to coupling with supplied hose clamp
6
and tighten bulkhead nut
with supplied screws
into bulkhead fitting and secure with coupling
remote condensing
Dispenser preparation
Hot Water
160 F (71 C)
12"
(304,8mm)
min.
DROP-IN  •  RIDE Technology
3