Daintree GE current Lumination LPL Gen D Series Manuel d'installation - Page 2
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Daintree GE current Lumination LPL Gen D Series. Daintree GE current Lumination LPL Gen D Series 4 pages. Led luminaire
Lumination
LPL Gen D Series
®
Luminaire Installation
1
TURN OFF POWER at the source to the
luminaire.
LPL22x Series
T-Bar
LPL24x Series
Sensor enclosure
(optional)
3
Insert luminaire into T-bar ceiling grid. Unit should
not move freely within the ceiling grid. To ensure a
consistent appearance, align fixtures in the same
orientation throughout the ceiling pattern.
Sensor enclosure
(optional)
K.O. for EMBB only
K.O. for EMBB only
T-Bar
CCT switch
2
Default lumen level is M(medium), and default CCT is
4000K. For other lumen level or CCT, loosen screw and
remove switch cover, then set switch to the desired
lumen level or CCT by screwdriver. Re-attach cover and
tighten screw.
T-Bar
Bend the brackets on the housing to make sure
4
they hook to T-Bar.
Secure safety cable to connection hole as needed
to meet local seismic requirements. Safety cable
and method of attachment to the building are
provided by contractor according to local
building codes.
2
Installation Guide
Lumen switch
Switch cover
Screw
Connection hole
for safety cable
Bracket on the housing
2