DV8 OFFROAD SPBR-05 Manuel d'installation - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} DV8 OFFROAD SPBR-05. DV8 OFFROAD SPBR-05 12 pages. Trailing arm skid plate
INSTALLATION
MANUAL
STEP 7 |
Use the floorjack to
lift the gas tank/skid plate back into
place, and loosely thread all the factory
hardware into place.
There are (6) factory bolts total to replace.
Once all hardware is threaded loosely,
secure all factory hardware for the gas
tank skid using an 18mm socket.
Torque all bolts to 59 ft-lbs.
855-680-9595
NEED HELP?