DV8 OFFROAD SPBR-05 설치 매뉴얼 - 페이지 6
{카테고리_이름} DV8 OFFROAD SPBR-05에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DV8 OFFROAD SPBR-05 12 페이지. Trailing arm skid plate
INSTALLATION
MANUAL
STEP 7 |
Use the floorjack to
lift the gas tank/skid plate back into
place, and loosely thread all the factory
hardware into place.
There are (6) factory bolts total to replace.
Once all hardware is threaded loosely,
secure all factory hardware for the gas
tank skid using an 18mm socket.
Torque all bolts to 59 ft-lbs.
855-680-9595
NEED HELP?