DV8 OFFROAD SPBR-05 Installatiehandleiding - Pagina 6

Blader online of download pdf Installatiehandleiding voor {categorie_naam} DV8 OFFROAD SPBR-05. DV8 OFFROAD SPBR-05 12 pagina's. Trailing arm skid plate

INSTALLATION
MANUAL
STEP 7 |
Use the floorjack to
lift the gas tank/skid plate back into
place, and loosely thread all the factory
hardware into place.
There are (6) factory bolts total to replace.
Once all hardware is threaded loosely,
secure all factory hardware for the gas
tank skid using an 18mm socket.
Torque all bolts to 59 ft-lbs.
855-680-9595
NEED HELP?