Fujitsu Eternus DX90 S2 Installation du matériel - Page 19

Parcourez en ligne ou téléchargez le pdf Installation du matériel pour {nom_de_la_catégorie} Fujitsu Eternus DX90 S2. Fujitsu Eternus DX90 S2 23 pages. Server connection. (fibre channel) for aix
Également pour Fujitsu Eternus DX90 S2 : Manuel de l'utilisateur (35 pages), Manuel de l'utilisateur (42 pages), Manuel (18 pages), Instal Setup (20 pages), Manuel de configuration Connexion au serveur (13 pages), Manuel de configuration (28 pages), Manuel de configuration (15 pages), Manuel de configuration (38 pages)

Fujitsu Eternus DX90 S2 Installation du matériel

Power Off Procedure

Verify with the customer that all server I/O is stopped
Also confirm that the "CACHE" LED in the Operator Panel is off
Hold down the "Power Switch" of the Controller Enclosure for
approximately 5 seconds
The ETERNUS DX system will shutdown all Enclosures gracefully
In case of moving ETERNUS to a new location, you naturally
have to also disconnect the AC power cords
from the PDUs after the system is
powered off
Hardware Installation
ETERNUS DX80 S2 and DX90 S2
Make sure the CACHE LED
of the Controller Enclosure
is off
18
Copyright Fujitsu Technology Solutions, Release August 2011