Avlite AV-SIGN-20 Manuel d'installation et d'entretien - Page 8
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'entretien pour {nom_de_la_catégorie} Avlite AV-SIGN-20. Avlite AV-SIGN-20 16 pages. Solar sign light
Installing the Light Assembly to a Post (AV-SIGN-20-PM)
The completed AV-SIGN-20-PM assembly can be mounted onto a post. Two people may be required
to install this AV-SIGN-20-PM to a post, depending on the height it is mounted.
a. The AV-SIGN-20-PM is designed to be fitted to a 90mm OD pipe, but can be fitted to any post from
3"OD to 4"OD.
b. Position the AV-SIGN-20-PM against the post and fit 2 x U-Clamps to the upper and lower sections
of the bracket. Position the AV-SIGN-20-PM so the solar panel is not shaded when assembly is
completed.
c. Secure to the post by tightening the U-Clamps.
d. Position and mount the lights as required.
Charging the Battery
New lights should be left in the sun for 1-2 days to ensure the battery is charged before placing
in service.
Preferred Installation Location
For best light performance, ensure solar modules are not covered and are in clear view of the
sky with no shadows.
Latest products and information available at www.avlite.com
674
(26.5")
237
(9.3")
Activation
8
AV-SIGN-20
Solar Sign Light
432 typical
(17.0")