Dell EMC PowerSwitch S6100-ON Manuel d'installation - Page 23

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Dell EMC PowerSwitch S6100-ON. Dell EMC PowerSwitch S6100-ON 48 pages.

Dell EMC PowerSwitch S6100-ON Manuel d'installation
To remove the system from the rack, loosen the screws and slide the system out of the rack.
Figure 17. S6100–ON system installation
1. Extra screws to restrict front-back movement of the switch
2. Main screw

Chassis ground

After you mount the chassis, secure the chassis ground as follows:
To properly ground the chassis, Dell recommends using the two-hole lug shipped in a separate plastic bag with your chassis. The
two-hole lug must be a UL recognized, crimp-type lug. To connect the ground cable to the framework or cabinet and to mount
the unit, use thread-forming unit mounting screws that remove paint or nonconductive coatings.
CAUTION:
Grounding conductors must be made of copper. Do not use aluminum conductors.
NOTE:
The rack installation ears are not suitable for grounding.
NOTE:
Coat the two-hole lug with an anti-oxidant compound before crimping. Also, bring any unplated mating surfaces to a
shiny finish and coat with an anti-oxidant before mating. Plated mating surfaces must be clean and free from contamination.
NOTE:
Never use the same bolts to secure multiple grounding cables.
1. Locate the chassis ground lug nuts and holes on the chassis back.
S6100–ON installation
23