Cisco 7200 VXR Series Manuel de démarrage rapide - Page 11
Parcourez en ligne ou téléchargez le pdf Manuel de démarrage rapide pour {nom_de_la_catégorie} Cisco 7200 VXR Series. Cisco 7200 VXR Series 48 pages. Preparing for installation
Également pour Cisco 7200 VXR Series : Fiche technique (12 pages), Manuel (14 pages)
Figure 5
Attaching the Rack-Mount Brackets to the Front of the Chassis—Chassis Recessed
Cisco 7200
Series
3
2
1
Cable-management bracket
2
Rack-mount bracket
Brackets Front-Mounted—Chassis Recessed in Rack
Locate the rack-mount and cable-management brackets and screws and a Number 2 Phillips screwdriver.
Step 1
Align the cable-management bracket (1) to the side of the router. Align the rack-mount bracket over it—as shown
above—and insert and tighten the screws (3).
Go to the "Two-Post or Four-Post Rack Installation" section on page 16.
Step 2
If you are not using the cable-management brackets, align the rack-mount brackets (2)—as shown above—to the router
and insert and tighten the screws.
If you have an NPE-G1 or NPE-G2 installed, go to the "NPE-G1 and NPE-G2 Rear Cable-Management Brackets on a
Front-Mounted Router" section on page 12.
If you do not have an NPE-G1 or NPE-G2 installed, go to the "Two-Post or Four-Post Rack Installation" section on page 16.
ETHERNET 10BT
1
TOKEN RING
ETHERNET-10BFL
FAST ETHERNET INPUT/OUTPUT CONTROLLER
3
M4 x 8-mm Phillips flathead screws
11