Cisco 7200 VXR Series Manual de início rápido - Página 11
Procurar online ou descarregar pdf Manual de início rápido para Ponto de acesso sem fios Cisco 7200 VXR Series. Cisco 7200 VXR Series 48 páginas. Preparing for installation
Também para Cisco 7200 VXR Series: Ficha de dados (12 páginas), Manual (14 páginas)
Figure 5
Attaching the Rack-Mount Brackets to the Front of the Chassis—Chassis Recessed
Cisco 7200
Series
3
2
1
Cable-management bracket
2
Rack-mount bracket
Brackets Front-Mounted—Chassis Recessed in Rack
Locate the rack-mount and cable-management brackets and screws and a Number 2 Phillips screwdriver.
Step 1
Align the cable-management bracket (1) to the side of the router. Align the rack-mount bracket over it—as shown
above—and insert and tighten the screws (3).
Go to the "Two-Post or Four-Post Rack Installation" section on page 16.
Step 2
If you are not using the cable-management brackets, align the rack-mount brackets (2)—as shown above—to the router
and insert and tighten the screws.
If you have an NPE-G1 or NPE-G2 installed, go to the "NPE-G1 and NPE-G2 Rear Cable-Management Brackets on a
Front-Mounted Router" section on page 12.
If you do not have an NPE-G1 or NPE-G2 installed, go to the "Two-Post or Four-Post Rack Installation" section on page 16.
ETHERNET 10BT
1
TOKEN RING
ETHERNET-10BFL
FAST ETHERNET INPUT/OUTPUT CONTROLLER
3
M4 x 8-mm Phillips flathead screws
11