Cisco UCS B200 M3 Manuel d'installation - Page 17
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Cisco UCS B200 M3. Cisco UCS B200 M3 34 pages. Blade server
Également pour Cisco UCS B200 M3 : Note d'installation et d'entretien (36 pages), Note d'installation et d'entretien (37 pages), Manuel (8 pages), Manuel de mise à jour (21 pages), Note d'installation et d'entretien (28 pages)
c) Lift the tool and CPU straight up.
Figure 12: Proper Alignment of CPU Pick and Place Tool (for Intel Xeon E5-2600 Series Processors)
1
Alignment mark on the button/handle of the pick and
place tool
Installing a New CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
• The CPU is supported for that given server model. This may be verified via the server's Technical Specifications ordering guides
or by the relevant release of the Cisco UCS Capability Catalog.
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in Cisco UCS Manager will recognize
and allow the new CPU.
The Pick-and-Place tools used in this procedure are required to prevent damage to the contact pins between
Caution
the motherboard and the CPU. Do not attempt this procedure without the required tools, which are included
with each CPU option kit. If you do not have the tool, you can order a spare: Cisco PID UCS-CPU-EP-PNP=
for 10-, 8-, 6-, 4-, or 2-core CPUs (green); UCS-CPU-EP2-PNP= for v2 12-core CPUs (purple).
2
Alignment mark on the socket
17