Cisco UCS B200 M3 Installatiehandleiding - Pagina 17
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Cisco UCS B200 M3. Cisco UCS B200 M3 34 pagina's. Blade server
Ook voor Cisco UCS B200 M3: Installatie en onderhoud (36 pagina's), Installatie en onderhoud (37 pagina's), Handmatig (8 pagina's), Upgrade handleiding (21 pagina's), Installatie en onderhoud (28 pagina's)
c) Lift the tool and CPU straight up.
Figure 12: Proper Alignment of CPU Pick and Place Tool (for Intel Xeon E5-2600 Series Processors)
1
Alignment mark on the button/handle of the pick and
place tool
Installing a New CPU and Heat Sink
Before installing a new CPU in a server, verify the following:
• The CPU is supported for that given server model. This may be verified via the server's Technical Specifications ordering guides
or by the relevant release of the Cisco UCS Capability Catalog.
• A BIOS update is available and installed that supports the CPU and the given server configuration.
• If the server will be managed by Cisco UCS Manager, the service profile for this server in Cisco UCS Manager will recognize
and allow the new CPU.
The Pick-and-Place tools used in this procedure are required to prevent damage to the contact pins between
Caution
the motherboard and the CPU. Do not attempt this procedure without the required tools, which are included
with each CPU option kit. If you do not have the tool, you can order a spare: Cisco PID UCS-CPU-EP-PNP=
for 10-, 8-, 6-, 4-, or 2-core CPUs (green); UCS-CPU-EP2-PNP= for v2 12-core CPUs (purple).
2
Alignment mark on the socket
17