Cisco UCS 5100 Mise en place - Page 10

Parcourez en ligne ou téléchargez le pdf Mise en place pour {nom_de_la_catégorie} Cisco UCS 5100. Cisco UCS 5100 17 pages. Uplink ethernet connection
Également pour Cisco UCS 5100 : Mise en place (4 pages), Manuel du micrologiciel (10 pages), Configuration (5 pages), Manuel (14 pages), Instructions de mise à niveau (10 pages), Manuel de démarrage rapide (8 pages), Manuel de configuration (6 pages)

Cisco UCS 5100 Mise en place
4.2 Assign VSAN to FC Uplink Port in Fabric Interconnect (Alternate
Method)
Choose the FC port linked to your SAN network and assign this port to the VSAN created in the previous
step.
These FC Uplinks must already be provisioned with respective VSAN IDs on the SAN network side (MDS
switch).
1.
In the Navigation pane, choose the SAN tab.
2.
Expand SAN Cloud and then expand FC Uplinks − Fabric A.
3.
Expand Uplink FC Ports. In this test case, choose FC Port 2/1 that has connection to the upstream
SAN switch.
4.
Either right−click the desired FC port, or, in the Work pane to the right, click the port as shown.
5.
In the Properties pop−up window for FC Port 1, choose the VSAN to which this FC port will pinned
from the drop−down menu.
6.
Click OK.