ABB AutoLink Manuel d'instruction - Page 6
Parcourez en ligne ou téléchargez le pdf Manuel d'instruction pour {nom_de_la_catégorie} ABB AutoLink. ABB AutoLink 12 pages. 15kv, 27kv, 38kv
Également pour ABB AutoLink : Instructions de montage (11 pages)
TEHI95094 – Rev. 2
6/ 12
6.3 Initial Setting or Previous Setting Modification Instructions
Remove the top cap (Fig. 1 A) using a 34mm fork spanner holding the tube with the hand
(Fig. 1 B). Check condition of O-ring (Fig. 2 E), and replace it if necessary, applying grease
on it.
Set the dip-switches to calibrate the current (Fig. 2 C, 4 switches) and set counting
operations (Fig. 2 D, 2 switches) using a small screwdriver according to table 1 settings.
Note: handle with care without damaging the switches. Settings must be made in a clean
and dry environment.