Dixon Bayco DBC Series Instructions d'entretien et d'utilisation - Page 9

Parcourez en ligne ou téléchargez le pdf Instructions d'entretien et d'utilisation pour {nom_de_la_catégorie} Dixon Bayco DBC Series. Dixon Bayco DBC Series 13 pages. 3" dry disconnects

DBC 3" Series Dry Disconnects
31. While holding the coupler BODY firmly, push the LEVER towards
the open position and allow the coupler to open itself using the spring
force against the SEAL CYLINDER. The coupler should 'snap' to the
open without delay and the SEAL CYLINDER movement should
remain in contact with the POPPET movement. If the SEAL
CYLINDER separates from the POPPET or if the movement is
'sluggish', do not return this unit to service.

Test Procedure

The procedure for testing these products involves applying pressure
to the coupler, submerging the coupler under water and checking for
the appearance of bubbles. Generally the appearance of bubbles
indicates a leak and is cause for rejection. There is often trapped air
in various parts of the unit so the tester needs to make sure that the
bubbles being seen are a leak (a steady repeating bubbling pattern)
and not merely trapped air being released.
Safety glasses must always be worn when using
compressed air for any testing.
Never rotate the LEVER to the open position while the
coupler is under pressure and not coupled to a Dry Disconnect
Adapter. This action can cause the LEVER to rapidly rotate and
cause injury.
1. Install a test plug with airline adapter into the threaded end of the
coupler.
2. With LEVER in closed position, pressurize the coupler to between
3 P.S.I.G. and 5 P.S.I.G. Submerge under water and check for leaks.
(Low Pressure Closed)
3. Remove pressure and rotate LEVER to the open position.
4. Pressurize the coupler to between 3 P.S.I.G. and 5 P.S.I.G.
Submerge under water and check for leaks. (Low Pressure Open).
5. Increase pressure to 30 P.S.I.G. while still under water and check
for leaks. (High Pressure Open).
6. Remove pressure, remove unit from water and close LEVER.
7. Pressurize the unit to 30 P.S.I.G. Submerge under water and
check for leaks. (High Pressure Closed)
DBC 3" SERIES
877.582.3569
9