ACR Heat HERITAGE N25 Panduan Petunjuk Pemasangan dan Pengoperasian - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Petunjuk Pemasangan dan Pengoperasian untuk Perapian Dalam Ruangan ACR Heat HERITAGE N25. ACR Heat HERITAGE N25 10 halaman.
The inside of the stove is lined with vermiculite panels. These will break
under strong impact. Therefore, please ensure that when reloading your
stove, logs are placed onto the stove base rather than thrown to avoid
any breakages. The vermiculite panels are a "wear and tear" component
and are not covered by warranty.
FIRST FIRING OF APPLIANCE
During the first firing of your stove, the high temperature paint will cure.
This process will give off some smoke for a couple of hours depending on
the temperature of the fire.
This is perfectly normal but we do
recommend that you leave any windows and doors open for this period in
order to ventilate the room.
As part of the curing process, the paint will become soft during the
heating.
You should therefore be careful when touching the stove to
avoid damaging the paint finish or leaving any marks on it.
LIGHTING THE STOVE
Ensure the protective plastic on the stove base has been removed before
attempting to light the fire. Open both sets of airslides fully and place
newspaper and kindling wood or firelighters onto the stove base and light
with a taper or match. Leave the doors slightly open. Allow the fire to
burn fiercely at this point in order to warm the chimney as quickly as
possible.
Gradually add larger logs until the fire is well established.
Close the doors at this point but keep both airslides in the fully open
position. When the fire is fully established, close down the primary air
slide and use only the secondary airslide to control the rate of burning.
For overnight burning, load the stove with logs and once well established,
close the doors and shut down both sets of airslides.
When using the optional solid fuel grate to burn smokeless fuels, we
recommend that you place either kindling wood and newspapers or
firelighters onto the grate and add a small amount of solid fuel to the
kindling.
Once lit, open both airslides and pull the doors together
leaving just a small gap. Gradually add more solid fuel to the grate until
the fire is established. The doors can now be closed and the secondary
airslide closed down. Control the rate of burning by using the primary
airslide.
RECOMMENDED FUELS
7