Duratuf KL1 Manual Petunjuk Perakitan - Halaman 12

Jelajahi secara online atau unduh pdf Manual Petunjuk Perakitan untuk Penyimpanan Luar Ruangan Duratuf KL1. Duratuf KL1 16 halaman. Kiwi series

Duratuf KL1 Manual Petunjuk Perakitan
Step 5: Bottom Door Guide: Slide Door to corner. Hang
Door Guide (108) on bottom of the Door. Make it
flush with Corner Flashing. Lift up approximately
3mm so that the Door will Slide freely. Pre-drill
hole and nail in place using a 50mm nail. Slide to
centre. Ensuring Door slides freely, pre-drill hole
and nail Door Guide in place. Check Door is not
binding in the middle then pre-drill holes into
each Rib at similar spacing into Door Step Flash-
ing. Nail off using 50mm nails.
Note:
For sheds with Raised Base Plate option the
Door Step Flashing will protrude down past the
Bottom Plate. Attach Door Guide with rivets.
Step 1: Position Barge Flashing (G102) on gable
ends. Position a Spouting (C103) and rivet
to the Barge Flashing at each end. Repeat
with other Spouting.
KL3 DOOR
KL3 BARGE & SPOUTING
DOOR
Step 2: Centralise Barge Flashing on end and
rivet in place, one rivet into every second
Rib. Fit two rivets through top of Barge
into Rib. Repeat with other Barge Flash-
ing. Check Spoutings are straight, then
rivet to Roof one rivet every second Rib.
12
CLADDING
BOTTOM
PLATE
DOOR
GUIDE