Dato CRMPL 201 Panduan Pengoperasian - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Pengoperasian untuk Aksesori Mobil Dato CRMPL 201. Dato CRMPL 201 14 halaman. Auto body collision repair system
Figur e3-1
4. Installation & Debugging of Pulling Towers
A Lif t pulling tow ers with jack to make slide wheel closed with benc h tr ack, the
dist ance bet ween the upper wheel and bench out er is 2m m. (F igure 3- 3)
B Inst all the hook plate of pulling tow er, and lock the screw s (F igure 3- 4)
Figure3- 3
5. Installation of tool cart and placement of tools
Use M8 × 10( 4pc), M8 ×35( 4pc) bolt s to fix tool boar d, bas e and triangle
connect ing plat e toget her. Inser t hook s on bot h sizes of tool boar ds. Put clamps
and ac cessories on the boar d.( F igur e 3- 5)
Figure3- 5
4
Figure3- 2
Figure3- 4