Cisco 9124 - mds multilayer fabric switch Panduan Konfigurasi - Halaman 34

Jelajahi secara online atau unduh pdf Panduan Konfigurasi untuk Beralih Cisco 9124 - mds multilayer fabric switch. Cisco 9124 - mds multilayer fabric switch 49 halaman. Mds 9000 series
Juga untuk Cisco 9124 - mds multilayer fabric switch: Spesifikasi (2 halaman), Lembar data (9 halaman), Spesifikasi (3 halaman), Catatan Rilis (48 halaman), Catatan Rilis (44 halaman), Catatan Rilis (36 halaman), Catatan Rilis (22 halaman), Catatan Rilis (3 halaman), Catatan Rilis (40 halaman), Manual (16 halaman), Panduan Pemasangan Perangkat Keras (36 halaman)

Cisco 9124 - mds multilayer fabric switch Panduan Konfigurasi
Figure 26 Add Target Portal window
3.
Enter the IP address or DNS name of the first configured iSCSI GbE port.
4.
Click OK.
5.
Repeat steps 2 through 4 using the IP address or DNS
name of the second configured iSCSI GbE port.
The IP addresses are now added to the list of Target Portals
(Figure
27).
The iSCSI Initiator has connected to the iSCSI-enabled C-Series switch. The switch generates a unique
virtual WWPN for the iSCSI Initiator's IP address.
34