Cisco UCS B200 M3 Catatan Instalasi dan Layanan - Halaman 17

Jelajahi secara online atau unduh pdf Catatan Instalasi dan Layanan untuk Server Cisco UCS B200 M3. Cisco UCS B200 M3 28 halaman. Blade server
Juga untuk Cisco UCS B200 M3: Panduan Instalasi (34 halaman), Catatan Instalasi dan Layanan (36 halaman), Catatan Instalasi dan Layanan (37 halaman), Manual (8 halaman), Panduan Peningkatan (21 halaman)

Cisco UCS B200 M3 Catatan Instalasi dan Layanan
Figure 13: Using the CPU Pick and Place Tool to Insert the CPU
1
Step 6
Close the socket latch. See callout 1 in the following figure.
Step 7
Secure the first hook, which has the following icon: See callout 2 in the following figure.
Step 8
Secure the second hook, which has the following icon:
Figure 14: Replacing the Heat Sink (B200 M3 Shown)
Step 9
Using the syringe of thermal grease provided with replacement CPUs and servers, add 2 cubic centimeters of thermal
grease to the top of the CPU where it will contact the heat sink. Use the pattern shown. This should require half the
contents of the syringe.
Caution
The thermal grease has very specific thermal properties. Thermal grease from other sources should not be
substituted because it may lead to damage.
Alignment mark on the tool
button/handle
2
See callout 3 in the following figure.
Alignment mark on the CPU
socket
17