Duratuf GS72 Manuale di istruzioni per il montaggio - Pagina 14

Sfoglia online o scarica il pdf Manuale di istruzioni per il montaggio per Deposito all'aperto Duratuf GS72. Duratuf GS72 16.

Duratuf GS72 Manuale di istruzioni per il montaggio
SECURING SHED
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
TIMBER PEGS—WOODEN FLOOR
• The optional Duratuf Timber Peg Down Kit includes six H5 treated
timber pegs that can be hammered into the ground and then at-
tached to the Base Plate with stainless steel screws. A Guardian
timber floor can then be fitted on top of the Base Plate if required.
BOLT DOWN KIT—CONCRETE
• The optional Duratuf Bolt Down Kit includes 6 x galvanised
brackets, screws and dynabolts.
• Space the brackets evenly around the shed and fix to the Bottom
Plate and the concrete slab. A 10mm masonry drill bit is required.
FITTING A GUARDIAN FLOOR KIT (OPTIONAL)
• Position the Floor Joists centrally between the side
Base Plates and skew nail each end with two 75mm
nails.
• Check that the shed is sitting level and square . Check
that the diagonal Bottom Plate measurements are the
same. This ensures that the shed base is square.
• Place the Floor Boards in position. (You may need to
cut the last Floor Board to the correct width using a
Skill Saw.) Nail each Floor Board in, using two 50mm
nails each end and two nails into each floor joist.
13
BACK BASE PLATE
JOIST
FRONT BASE PLATE