- ページ 14

屋外倉庫 Duratuf GS72のPDF 組立説明書をオンラインで閲覧またはダウンロードできます。Duratuf GS72 16 ページ。

Duratuf GS72 組立説明書
SECURING SHED
Secure your shed using Treated Timber Pegs or a Bolt Down Kit
TIMBER PEGS—WOODEN FLOOR
• The optional Duratuf Timber Peg Down Kit includes six H5 treated
timber pegs that can be hammered into the ground and then at-
tached to the Base Plate with stainless steel screws. A Guardian
timber floor can then be fitted on top of the Base Plate if required.
BOLT DOWN KIT—CONCRETE
• The optional Duratuf Bolt Down Kit includes 6 x galvanised
brackets, screws and dynabolts.
• Space the brackets evenly around the shed and fix to the Bottom
Plate and the concrete slab. A 10mm masonry drill bit is required.
FITTING A GUARDIAN FLOOR KIT (OPTIONAL)
• Position the Floor Joists centrally between the side
Base Plates and skew nail each end with two 75mm
nails.
• Check that the shed is sitting level and square . Check
that the diagonal Bottom Plate measurements are the
same. This ensures that the shed base is square.
• Place the Floor Boards in position. (You may need to
cut the last Floor Board to the correct width using a
Skill Saw.) Nail each Floor Board in, using two 50mm
nails each end and two nails into each floor joist.
13
BACK BASE PLATE
JOIST
FRONT BASE PLATE