APlusLift HW-10KOH Manuale di installazione e funzionamento - Pagina 9

Sfoglia online o scarica il pdf Manuale di installazione e funzionamento per Sistemi di sollevamento APlusLift HW-10KOH. APlusLift HW-10KOH 20. 2-post over head car lift 10,000lb capacity
Anche per APlusLift HW-10KOH: Manuale di installazione e istruzioni per l'uso (17 pagine)

APlusLift HW-10KOH Manuale di installazione e funzionamento
Step 5 (Installing Power Unit and Routing Hydraulic Hoses)
 Mount the power unit onto the main side column with four hex bolts.
 Connect two 4 1/4" fittings to both cylinders. Connect T-fitting to the power unit.
 Connect short hydraulic hose to the power unit and the cylinder in power unit post.
 Connect long hydraulic hose to the power unit and the cylinder in the opposite post.
Run the long hose over the overhead beam.
 See figures below for hose layout and routing to the power unit. Do not over tighten the
fittings.
9