AgSense Crop Link Pro Istruzioni per il cablaggio - Pagina 6

Sfoglia online o scarica il pdf Istruzioni per il cablaggio per Strumenti di misura AgSense Crop Link Pro. AgSense Crop Link Pro 12. 2017-18 4-20ma inputs and scaled voltage inputs
Anche per AgSense Crop Link Pro: Istruzioni per il cablaggio (12 pagine)

Wiring the G3 Tank Monitor sensor
1. Connect the Red wire from the Tank Monitor Sensor to the terminal marked 12V
OUT as shown above.
2. Connect the Black wire from the Tank Monitor Sensor to any terminal marked GND
as shown above.
3. Connect the White wire from the Tank Monitor Sensor to the terminal marked AN1
as shown above.
Note: Repeat steps 1-2 for a second Tank Monitor sensor, but connect the White wire to AN2
to the Crop Link Unit
instead.
Page 4