AgSense Crop Link Pro 배선 지침 - 페이지 6
{카테고리_이름} AgSense Crop Link Pro에 대한 배선 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. AgSense Crop Link Pro 12 페이지. 2017-18 4-20ma inputs and scaled voltage inputs
AgSense Crop Link Pro에 대해서도 마찬가지입니다: 배선 지침 (12 페이지)
Wiring the G3 Tank Monitor sensor
1. Connect the Red wire from the Tank Monitor Sensor to the terminal marked 12V
OUT as shown above.
2. Connect the Black wire from the Tank Monitor Sensor to any terminal marked GND
as shown above.
3. Connect the White wire from the Tank Monitor Sensor to the terminal marked AN1
as shown above.
Note: Repeat steps 1-2 for a second Tank Monitor sensor, but connect the White wire to AN2
to the Crop Link Unit
instead.
Page 4