Dell Networking Z9500 Manuale di installazione - Pagina 21

Sfoglia online o scarica il pdf Manuale di installazione per Interruttore Dell Networking Z9500. Dell Networking Z9500 47. Z9500 switch
Anche per Dell Networking Z9500: Manuale introduttivo (34 pagine)

Dell Networking Z9500 Manuale di installazione
Installing and Removing Tool-less Rails (Square-Hole)
1.
Position the left and right rail end pieces FRONT facing inward and orient each end piece to seat in
the holes on the front side of the vertical rack flanges (1).
2.
Align each end piece in the bottom and top holes of the desired U spaces (2).
3.
Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks into
place. Repeat these steps to position and seat the front end piece on the vertical flange.
NOTE: Make sure the blue release latch is closed.
4.
To remove the rails, pull on the blue release latch on each end piece and unseat the rail from the
rack.
Z9500 Installation
21