Dell Networking Z9500 설치 매뉴얼 - 페이지 21

{카테고리_이름} Dell Networking Z9500에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dell Networking Z9500 47 페이지. Z9500 switch
Dell Networking Z9500에 대해서도 마찬가지입니다: 시작하기 매뉴얼 (34 페이지)

Dell Networking Z9500 설치 매뉴얼
Installing and Removing Tool-less Rails (Square-Hole)
1.
Position the left and right rail end pieces FRONT facing inward and orient each end piece to seat in
the holes on the front side of the vertical rack flanges (1).
2.
Align each end piece in the bottom and top holes of the desired U spaces (2).
3.
Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks into
place. Repeat these steps to position and seat the front end piece on the vertical flange.
NOTE: Make sure the blue release latch is closed.
4.
To remove the rails, pull on the blue release latch on each end piece and unseat the rail from the
rack.
Z9500 Installation
21