Dell Networking Z9500 Installatiehandleiding - Pagina 21
Blader online of download pdf Installatiehandleiding voor {categorie_naam} Dell Networking Z9500. Dell Networking Z9500 47 pagina's. Z9500 switch
Ook voor Dell Networking Z9500: Aan de slag handleiding (34 pagina's)
Installing and Removing Tool-less Rails (Square-Hole)
1.
Position the left and right rail end pieces FRONT facing inward and orient each end piece to seat in
the holes on the front side of the vertical rack flanges (1).
2.
Align each end piece in the bottom and top holes of the desired U spaces (2).
3.
Engage the back end of the rail until it fully seats on the vertical rack flange and the latch clicks into
place. Repeat these steps to position and seat the front end piece on the vertical flange.
NOTE: Make sure the blue release latch is closed.
4.
To remove the rails, pull on the blue release latch on each end piece and unseat the rail from the
rack.
Z9500 Installation
21