Cisco Nexus 7000 Series Manuale di installazione - Pagina 3

Sfoglia online o scarica il pdf Manuale di installazione per Server Cisco Nexus 7000 Series. Cisco Nexus 7000 Series 16. Switch chassis
Anche per Cisco Nexus 7000 Series: Manuale di riferimento (2 pagine), Manuale di istruzioni per l'installazione (39 pagine), Riferimento (34 pagine), Manuale di installazione (18 pagine), Configurazione (8 pagine), Manuale di configurazione (28 pagine), Manuale di avvio rapido (10 pagine), Manuale di avvio rapido (29 pagine), Manuale di istruzioni per la sostituzione (14 pagine), Manuale di istruzioni per la sostituzione (21 pagine), Manuale di risoluzione dei problemi (10 pagine)

Cisco Nexus 7000 Series Manuale di installazione
Installing the Switch Chassis
• Air filter kit — Optional
• Air filter (1) for the front door
• Cable-management frame brush filters (2)
• M3 x 12 mm flat-head Phillips screws (4)
• Center-mount kit — For Two-Post rack installation
Step 2
Check the contents of each box for damage.
Step 3
If you notice any discrepancies or damage, send the following information to your customer service representative by
email:
• Invoice number of the shipper (see the packing slip)
• Model and serial number of the missing or damaged unit
• Description of the problem and how it affects the installation

Installing the Chassis in a Two-Post Rack

Before you begin
• Verify that the chassis shipment is complete and undamaged.
• Verify that a two-post rack is installed and secured to the subfloor.
• If there are other devices in the rack, verify that the devices that are heavier than this chassis are installed
• Verify that the data center ground is accessible where you are installing the chassis.
Note
Fully loaded, the chassis can weigh up to 81.7 lb (37.05 kg). You can lighten the chassis for easier moving
by removing a power supply. To determine the full weight of the chassis and the appropriate weight rating
for the mechanical lift, see
Warning
Stability hazard. The rack stabilizing mechanism must be in place, or the rack
must be bolted to the floor before you slide the unit out for servicing. Failure to
stabilize the rack can cause the rack to tip over.
below where you are going to install the chassis and lighter devices are installed above where you are
going to install the chassis.
Weights and Quantities for the Chassis, Modules, Fan Trays, and Power
Installing the Chassis in a Two-Post Rack
Installing the Switch Chassis
Supplies.
3