- ページ 11
ストリング・マシン Gamma 6004のPDF オーナーズマニュアルをオンラインで閲覧またはダウンロードできます。Gamma 6004 19 ページ。 6 point mounting
Gamma 6004 にも: オーナーズマニュアル (20 ページ), オーナーズマニュアル (20 ページ), オーナーズマニュアル (20 ページ)
STRINGING THE FRAME
Pulling Tension
Wrap the loose section of string once around
the roller and insert the string between the
diamoind dust coated string gripper plates.
Pull the string perpendicular to the gripper
plates while slowly rotating the tensioner
crank clockwise until the brake lever pops
out of the latching block. The string is now
tensioned and can be clamped in place with
the remaining fixed clamp.
Repeat the above steps until all main strings
are installed. Tie off ends of main strings as
per racquet manufacturers recommenda-
tions.
Clamping the First Main String
To begin stringing the main strings, thread
the two ends of the string through the two
center holes at the appropriate end of the
frame and continue through the opposite
center holes. Thread one end of the string
through the adjacent grommet hole and pull
excess by hand. Secure one of the strings
using a string clamp.
Pull the remaining end of the string with the
tensioner to the desired tension. Secure the
string with the remaining clamp.
Completing the String Job
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer.
10