- ページ 7
室内装飾品 BERNHARDT design a.k.a. C-baseのPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。BERNHARDT design a.k.a. C-base 20 ページ。

Step 18
Workwall mounted items attach to the Workwall by locking
the Workwall rails into a mating extrusion on the mounted
component. Simply lift the mounting item to the desired
attachment rail and rotate upward to a 45° angle. The
mating extrusion should slide into the Workwall rail. Slowly
rotate the mounting item back to level while keeping
pressure toward the Workwall.
Make sure to check that the full length of the mounting
item is engaged into the Workwall Rail.
Step 19
Once the component is hung make sure that the two
extrusions are fully engaged. If there are any dips in the
Workwall Structure it may cause the extrusions to not fully
engage.
This is a critical step – please verify.
Step 20
This step can be done before or after an overhead is
installed.
To install the LED Light Rail, scribe a line 6" back from the
front edge of the shelf or overhead. Space the Light Rail
Mounting Brackets evenly over the entire length of the
Light Rail. Attach the Light Rail Mounts following the
instructions printed on each one.
September 2012