- ページ 3

電動工具 Ceyear 6481 SeriesのPDF クイックマニュアルをオンラインで閲覧またはダウンロードできます。Ceyear 6481 Series 6 ページ。 Optical fiber fusion splicer

Fusion Operation
Preparation of Fiber
1. First fit the fiber into the heat-shrink
tube.
2. Strip off the fiber and make sure that
the coating residue on the stripped
fiber has been removed.
3. Clean the fiber with anhydrous
ethanol at a concentration of 99% or
more.
4. Cut the fiber at the correct cutting
length.
Fusion fiber
1. Place the fiber on the fusion splicer
and make sure that the fiber is on the
bottom of V-groove and the fiber end
is placed between the edge of
V-groove and the center of electrode.
2. Check the fusion and heating modes.
In case of the fusion for the standard
single-mode fiber (ITU-T G.652),
"SM-SM" mode shall be selected.
3. Close the windshield and start fusion.
4. Observe the fusion process through
the monitor.
Heat-shrink protection
1. Take out the finished fiber.
2. Place the heat-shrink tube at the
middle of heater and move the fiber so
that the fusion point is at the center of
heat-shrink tube.
3. Close the heater cover and start
heating.
4. After heat shrink is completed, take out
the heat-shrink tube. If the heat-shrink
effect is poor, the heating time may be
modified accordingly (in the heating
mode menu).
Coated fiber
Bare fiber
涂覆光纤
裸光纤
10-16mm
V型槽边缘
V-groove edge
Φ80-150um
Electrode
电极中心
center