- ページ 3
配管製品 Arcade ARC13のPDF インストレーション・インストラクションをオンラインで閲覧またはダウンロードできます。Arcade ARC13 5 ページ。 Single lever bidet mixer with pop up waste
Beautifully
Traditional
Pop-up waste lever
Plug
Vertical control
Plug
Rod extension
adjustment
screw
Control rod link
Plug
housing
Foam
Horizontal control rod
washer
Bidet
Rubber
washer
Body
Ball
Body
washer
ATTENTION
Having first checked all new connections, turn on the mains stop cock, close all
taps except the new taps and as the system starts to refill, check for leaks. Once you
have satisfied yourself that there are no leaks, switch on the water heating.
4
Tap Body
Fixing Bolt
Hose
Ball joint retainer
Retainer washer
INSTALLATION INSTRUCTIONS
First shut off your water heating system, then with your mains stop cock closed, open the
lowest cold and hot taps in the house and allow to run until the cold storage tank and
pipes are empty (the hot storage cylinder always remains full).
Fitting isolating valve to inlet feeds is recommended for ease of maintenance.
INSTALLATION
Note: Remember to turn off mains water supply before connecting to any existing pipe work.
1: Install the main body:
a) Fit the "O" ring into the groove on the underside of the tap body.
b) Screw the fixing bolt and the flexible hoses into the mixer body, and fully hand tighten.
c) Pass the tail of flexible pipes through the hole on the bidet from above, and place the
mixer in position on the bidet, to see if any alteration to the existing supply pipe work is
necessary. Make any necessary alterations to the pipe work if needed.
"O" Ring
d) Tighten the rubber washer, the brass washer with the fixing nut from the under-side
of the bidet. Check that the mixer body is correctly positioned, fully tighten the fixing nut .
e) Connect the water supply pipes to the tails of the flexible hoses for the hot water and cold water.
Rubber Washer
2: Pop-up waste
Brass Washer
a) Insert the pop-up waste lever into the slot at the back of the mixer body.
Fixing Nut
b) From the underside of the bidet screw the pop-up waste lever into the control rod extension.
Spanner
c) Assemble the pop-up waste to the bidet, with the foam washer on top and the
below and hand tighten.
d) Push the body washer into the body of the pop-up waste, prepare the horizontal control rod
by sliding on the retainer washer and ball joint retainer making sure the cup part of the
retainer washer will sit around the ball. Slide the control rod link onto the vertical control
rod and then onto the horizontal control rod.
e) Insert the short end (with ball) of the horizontal control rod into the body (the horizontal
control rod can be slid through the control rod link) and clamp to the body with the ball
joint retainer. Do not over tighten.
f) Test the action of the pop-up waste and fully tighten the control rod link. Adjust the ball
joint retainer if required.
Arcade single lever bidet mixer
with pop up waste
www.arcadebathrooms.com
ARC13, ARC13 CHR
washer
rubber
5