- ページ 2
サーバー Cisco SCE8000 GBEのPDF インストールをオンラインで閲覧またはダウンロードできます。Cisco SCE8000 GBE 21 ページ。 10gbe platform
Cisco SCE8000 GBE にも: クイック・スタート・マニュアル (25 ページ), 設定マニュアル (18 ページ), 取り外しと交換の手順 (36 ページ)
Preparing for Installation
Before working on a chassis or working near power supplies, unplug the power cord on AC units;
Caution
disconnect the power at the circuit breaker on DC units.
The plug-socket combination must be accessible at all times because it serves as the main disconnecting
Note
device.
This unit is intended for installation in restricted access areas. A restricted access area can be accessed
Note
only through the use of a special tool, lock and key, or other means of security.
•
•
•
•
Preparing for Installation
•
•
•
Safety
Read the installation instructions before connecting the system to the power source.
Warning
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the
Note
absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority
or an electrician if you are uncertain that suitable grounding is available.
This product requires short-circuit (overcurrent) protection, to be provided as part of the building
Note
installation. Install only in accordance with national and local wiring regulations.
Cisco SCE8000 10GBE Installation and Configuration Guide
4-2
Preparing for Installation, page 4-2
Installing the Cisco SCE8000 Chassis in the Rack, page 4-14
Connecting the System Ground, page 4-19
Installing the Power Supplies in the Cisco SCE8000 Chassis, page 4-20
Safety, page 4-2
Site Requirements, page 4-3
Power Connection Guidelines, page 4-5
Chapter 4 Installing the Cisco SCE8000 Chassis
OL-21054-04