astra telematics AT200 설치 매뉴얼 - 페이지 4
{카테고리_이름} astra telematics AT200에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. astra telematics AT200 4 페이지.
8. Check Status and Commission Device
a. Before replacing panels and leaving the vehicle, we STRONGLY recommend that you
confirm normal operation and good communication, using either method below:
i. Calling the service provider to check that the device is online, confirming
external power, GNSS, GPRS and driver ID status.
ii. Send $TEST to the device by SMS and confirm the response.
iii. Any exceptions to the above should be addressed before leaving the vehicle
iv. Please refer to the OTA Device Test application note for further details and
examples of $TEST command responses and advice on interpretation /
handling of errors.
Example $TEST command response:
TEST:AT200V3
6.0.9.0
357322042745742
O2 UK
PWR:12.5V (100%)
BAT:100%
GPS:OK (95%)
GPRS:OK (98%)
APN:OK
SKT:OK
ACK:OK
IGN:OK (OFF)
IMOB:OFF
1. Confirm device IMEI is as expected
2. Confirm power connection and availability (should be near 100%)
3. Confirm GNSS (GPS) status and availability (should be near 100%)
4. Confirm GSM status and availability (should be near 100%)
5. Confirm all other status checks are "OK"
6. Confirm correct reporting of IGNITION state
7. Confirm correct operation of immobiliser (if fitted)