DoorHan FAST-750 설치 및 운영 매뉴얼 - 페이지 6
{카테고리_이름} DoorHan FAST-750에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorHan FAST-750 16 페이지.
DoorHan FAST-750에 대해서도 마찬가지입니다: 설치 및 운영 매뉴얼 (18 페이지)
1
DescrIPTIon
DESCRIPTION
8
2
3
10
6
7
ASSEMBLY
Pre-check
design of the gate shall meet the requirements of automation. In particular, check correspondence of the aperture dimensions with the
dimensions, specified in the manual, as well as aperture material rigidity.
•
Check for compliance of the gate with the standards en12604 and en12605 (refer to documentation for the gate).
•
When the gate is moving, there shall be no vehicles, people and others within its coverage area.
•
Check for good order state and intactness of the main moving units of the gate.
•
make sure, that the gate moves without jamming. If required, use special lubricant for cleaning and greasing of the parts of the guide,
do not use fat.
•
Check, if the gate is balanced and if the mechanical stops are installed.
•
Check, that the mechanical door lock I open before using automatic control.
•
make sure, that the minimal clearance between the ceiling and the top point, when the gate is moving, is not less than 35 mm
(pic.4).
•
Check, that the top roller of the gate leaf is in the vertical part of the guide rail, when the gate is completely closed (pic.5).
6
I n s t a l l a t I o n a n d o p e r a t I n g m a n u a l s e C t I o n a l - 7 5 0 / 1 2 0 0
pic. 4
9
2
4
1
5
1
pic. 5
1.
Case cover
2.
panel cover
3.
Key panel
4.
Control board
5.
motor-reducer
6.
transformer
7.
light lamp
8.
microswitch
9.
adapter
10.
protection cover