DoorHan FAST-750 설치 및 운영 매뉴얼 - 페이지 7
{카테고리_이름} DoorHan FAST-750에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DoorHan FAST-750 16 페이지.
DoorHan FAST-750에 대해서도 마찬가지입니다: 설치 및 운영 매뉴얼 (18 페이지)
CONNECTION OF OPERATOR TO GUIDE
standard installation
1
1
2
2
4
1.
6x15 tapping screws
2.
u-shaped bracket
3.
guide
4.
microswitc
INSTALLATION
Have only the certified personnel, which was trained at the authorized centres doorHan, carry out installation of the item.
•
to ensure maximum safety, the operator shall be installed only, when the gate is closed.
•
all operator fastening points must be used.
•
Fastening of the brackets must be reliable to ensure proper rigidity.
•
When drilling holes, an appropriate protection for hands and eyes shall be used.
•
read this manual to avoid mistakes by installation.
after pre-assembly has been completed, the vertical guide can be installed:
1.
mark on the ceiling a vertical line, which matches the centre of the gate horizontally (pic. 12).
2.
mark on the lintel a horizontal line in the place, where the gate by opening protrude upward to the maximum (see pic. 4).
3.
Fix the front roller so, that it is at least by 5 mm above the crossing of the marked lines (pic. 12). Follow instruction in par. 7.2 to
secure the fastening brackets.
4.
mark 2 places for fastening.
5.
then drill and fasten using tapping screws (pic. 12).
6.
position the guide on the floor so, that it is transversely to the gate.
7.
secure the guide to the front bracket and to the ceiling (pic. 13).
7
I n s t a l l a t I o n a n d o p e r a t I n g m a n u a l s e C t I o n a l - 7 5 0 / 1 2 0 0
connecTIon of oPeraTor To gUIDe
non-standard installation
2
2
3
3
5
In non-standard installation is applied (see picture below), re-install the
microswitch in a special place on the motor.
1.
6x15 tapping screws
2.
u – shaped bracket
3.
guide
4.
operator bushing
5.
microswitch
1
1
1
4
7