Akw AKW23116 설치, 서비스 및 사용자 지침 - 페이지 10
{카테고리_이름} Akw AKW23116에 대한 설치, 서비스 및 사용자 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Akw AKW23116 16 페이지. Basin mixer valve
Commissioning
Step 1
To Adjust Temperature Setting
1. Remove cover cap
2. Use a screwdriver to loosen the
centre screw in the lever.
3. Move the lever to full hot, note its
position and remove the lever.
4. Let the water run until the
temperature stabilises.
Step 2
1. Insert the 2mm A/F
hexagonal wrench key
(supplied) into the grub
screw in the centre of the
head assembly (refer to
illustration).
2. Rotate the grub screw as
necessary until the required
maximum blend temperature
is achieved. Rotate the grub
screw anticlockwise to increase
the temperature or clockwise to decrease
the temperature (refer to illustration).
3. Refit the lever in its original position. If required the lever can be fitted in any
position that allows unobstructed movement of the lever over its operating range.
4. Move the lever to the off position.
5. Use the screwdriver to tighten the screw in the lever.
10