Dunster House HANGOVER APEX G4-1824HAB 설치 매뉴얼 - 페이지 10
{카테고리_이름} Dunster House HANGOVER APEX G4-1824HAB에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dunster House HANGOVER APEX G4-1824HAB 18 페이지. Bar 1.8m x 2.4m (6ft x 8ft)
G4 - 1824HAB HANGOVER APEX BAR 1.8m x 2.4m - Assembly Steps
STEP 2: PANELS
Items:
2x G3 - PANEL AH - 1150x1905
1x SPLIT FRONT PANEL BOTTOM
1x SPLIT FRONT WINDOW PANEL
1x SPLIT FRONT PANEL TOP
36x 60mm SCREWS
1x DOOR FRAME
1x APEX PANEL RH
1x DOOR SIDE PANEL
1x APEX PANEL LH
1x SIDE PANEL
2x ST-PT15501775.Z
20x 30mm PIN NAILS
NOTE:
The layout of your doors can be changed by installing
the relevant Panels on the opposite side of your
Hangover Bar.
Principle of connecting panels
•
Line up the panels so that the top and bottom of
each panel are flush with one another.
•
Use 8x equally spaced 60mm screws to secure the
Front and Back Panel.
APEX PANEL RH
SCREW 60mm
G4 - DOOR FRAME
G4 -DOOR SIDE PANEL
SIDE WITHOUT DOOR:
•
Line up the panels so that the top and bottom of each panel are flush with
one another.
•
Use 4x equally spaced 60mm screws to secure APEX PANEL LH to the SIDE
PANEL.
PLEASE NOTE: The panels displayed are for a right sided door. To
change the door to the other side, switch from Panel LH to RH
** Pre-drill parts before fixing screws **
SIDE:
•
Ensuring the top of the frames are flush with one another, use 4x
60mm Screws to fix the DOOR FRAME to the DOOR Side Panels.
•
Use 4x 60mm Screws to fix Apex Panel RH to the previously assembled
structure.
•
Use 10x 30mm Pin Nails to fix ST-PT15501775.Z to the front of the
door frame. Make sure it is flush to the bottom and side of the Side
Panel - Note: The Back View is shown on the images referenced.
PLEASE NOTE: The panels displayed are for a right sided door. To
change the door to the other side, switch from Panel RH to LH
BACK PANEL:
FRONT PANEL:
APEX PANEL LH
SCREW 60 mm
G3 - PANEL AH - 1150x1905
SPLIT FRONT PANEL TOP
SPLIT FRONT WINDOW PANEL
SPLIT FRONT PANEL BOTTOM
ST-PT15501775.Z
SIDE PANEL
Page 10