AGS Merlin 1000SW+ 설치 및 운영 매뉴얼 - 페이지 4
{카테고리_이름} AGS Merlin 1000SW+에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AGS Merlin 1000SW+ 16 페이지. Gas, electric & water isolation controller
AGS Merlin 1000SW+에 대해서도 마찬가지입니다: 설치 운영 및 유지보수 (12 페이지)

Installation & Operation Manual
Typical Installation Arrangement
Terminal Connections
1. POWER / LINE IN
110-120V AC Power should be supplied to the [POWER / LINE IN] terminal and fused at 3A.
On connecting the mains supply to the panel the power LED indicator will light up – this is
located on the front cover (American Gas Safety Logo).
2. GAS SOLENOID VALVE OUTPUT
100-120V AC electrical power supplied from the [VALVE OUT] connector using a 3 core cable
can be connected to a gas solenoid valve which can shut the gas supply on alarm status.
Pressure sensors should be screwed to the downstream port of the valve.
Refer to your valve manual for more information and wiring!
1000SW+ IOM Rev: 09
01-20
Merlin 1000SW+
4