Galvin Engineering Safe-Cell 50150 제품 설치 매뉴얼 - 페이지 3

{카테고리_이름} Galvin Engineering Safe-Cell 50150에 대한 제품 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering Safe-Cell 50150 4 페이지. Prison basin set

Galvin Engineering Safe-Cell 50150 제품 설치 매뉴얼
1. Fit push button & basin outlet
Fit the push button and basin outlet into the bench.
Ensure the sealing o-ring is placed underneath the
push button and outlet body and the anti-rotation pin
locates properly.
Secure underneath with the supplied cup washer and
back nut.
3. Fit flexi hose
Connect water supply to isolation valve inlet.
Version 2, 30 August 2018, 3 of 4
2. Assemble valve body
 Assemble the valve body to the push
button.
 Ensure to apply thread tape for sealing.
Take care not to over-tighten.
4. Testing
 Push the button and ensure that there is
flow from the outlet.
 Inspect the tap and check for any leaks.
 Adjust flow with isolation valve, so
required flow is achieved