Galvin Engineering Safe-Cell 50150 제품 설치 매뉴얼 - 페이지 3
{카테고리_이름} Galvin Engineering Safe-Cell 50150에 대한 제품 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering Safe-Cell 50150 4 페이지. Prison basin set
1. Fit push button & basin outlet
Fit the push button and basin outlet into the bench.
Ensure the sealing o-ring is placed underneath the
push button and outlet body and the anti-rotation pin
locates properly.
Secure underneath with the supplied cup washer and
back nut.
3. Fit flexi hose
Connect water supply to isolation valve inlet.
Version 2, 30 August 2018, 3 of 4
2. Assemble valve body
Assemble the valve body to the push
button.
Ensure to apply thread tape for sealing.
Take care not to over-tighten.
4. Testing
Push the button and ensure that there is
flow from the outlet.
Inspect the tap and check for any leaks.
Adjust flow with isolation valve, so
required flow is achieved